国产免国产免费_欧美一区二区三区久久综合_国产精品久久久福利_女人国产香蕉久久精品_熟女肥臀白浆大屁股一区二区

HOME > NEWS > Product dynamic > Instructions for use of Marshall electric hammer

Instructions for use of Marshall electric hammer

2016-03-08 17:20:02   
Scope of application:
Marshall MDJ-IIA electric hammer real instrument applicable to standard hammer method asphalt mixed material specimen, for laboratory used to test of asphalt mixture of physical and mechanical properties, applicable to the Marshall test, indirect tensile test, such as the use of phi 152mm + 0.2mm x 115mm/ diameter of 101.6mm + 0.2mm x 63.5mm cylindrical test piece molding.
Main features:
1, automatic counting, automatic compaction, automatic shutdown.
2, with a hammer seat, and manual lift, you can easily lift the hammer.
3, semi automatic type die pressing device, take the mold more convenient.
4, one hammer will not fall off, not smashed, cracking.
Main technical index:
1, fall distance: (457 + 1.5) mm
2, compaction speed: 60 times / min + 5 / min.
3, the actual number of 0 - 99
4, hammer weight: 4536 + 5g
5. The diameter of the test die: 101.6mm
6, size: 700X500X1700mm
7, weight: 150KG
8, the power supply voltage: 380V
9, power: 750W
10, ambient temperature: 5 ~ 40
11, environmental humidity: less than 85%
Operation method
A. before each shot should be the actual pressure to the head, the inner wall of the test model and test mode base coating oil.
B. open the safety door, lift guide slide rod and hammer, with safety lever compaction pressure head lock.
C. according to the specification requirements will be mixing the asphalt mixture is put into test mode, the specimen mold push the steel platform test mold positioning pin, lock tight test mode.
D. filed a guide bar and a hammer, open the safety joystick, put down the compaction pressure head, close the safety door, press the start button compaction began, reaches a set number of automatic shutdown.
Common failures and exclusion
1, the work is not to mention the phenomenon of hammer or hammer in the process of lifting the hammer. Check that the drive chain is loose, such as loose adjustable back adjustment bolt Luo, hammer hammer real shrapnel is damaged, need to be replaced, pick hammer block and put the hammer key is worn too heavy.
2, the display on the digital display abnormal or not count. Check the wheel to upload switch is loose or close to the distance is too far.
3, after the power switch is switched on, the entire display screen does not display. Check whether the power supply is normal or distribution box after the fuse is blown.
4, in the process of lifting the hammer, along with the guide rod are brought together to take off. The chain is too loose, the guide rod is short of oil or dirt too much. Operation regulation of Marshall electric hammer
1, the first cabinet after the three plug connection. "Motor" to receive the cabinet motor input port, "close contact switch" to counter the socket. The "power" to the power socket, and the zero line must take good.
2, more than the work done, "to the" pull pull the encoder according to the required compaction times from 1 sets to 99 times. Turn on the power switch panel digital display "00" power display light.
3, press the start button controller starts to work, the light on, digital light display "00" motor rotation, provided hammer compaction, per hit a digital tube and a number, reaches a set strike after motor stop status, lights out.
4, press the pause button, the work is stopped, the status of the instructions out, press the start button again, work to return to normal, work in case of abnormal conditions can press the pause button, the number of times the number of times the number of times. After an experiment, press the reset button, then press the start button.
matters needing attention
1 counter to count the positive count.
2 the next time you should press the reset button, and then press the start button.
3 when the utility model is being carried out, the stopping button can be pressed when the machine is in trouble.
4 should regularly check the chain tension, if its deflection is greater than 10mm should be adjusted.
The 5 are not equipped with the mixture, and may not start compactor, when not in test mode or cotton pad of confetti.
6 regular chain, hammer sliding part lubrication.
7 after the end of each shot, should be the test mode, hit the real pressure head, steel platform for cleaning and processing.
8 regular inspection of the steel plate platform and the tension of the concrete base.

previous_page:Manual for the use of fully automatic asphalt mixing machine
next_page:Installation and maintenance of universal material testing machine

<ALL>

Telephone: 
0086-10-65469689
Address:Room1928
Block1,DongyaSanhuan
Majiapu Road(W),Beijing
 

京ICP備16005974號-1
主站蜘蛛池模板: 一边添奶一边添p好爽视频| 97精品伊人久久久大香线蕉| 成在人线av无码免费高潮喷水| 亚洲综合激情七月婷婷| 亚洲精品无码乱码成人| 国精产品一区一区三区mba下载| 亚洲av日韩综合一区在线观看| a级毛片免费观看在线播放| 国产一区二区三区精品视频| 精品无码一区二区三区的天堂| 无码少妇高潮浪潮av久久| 国产永久免费观看的黄网站| 亚洲欧美日韩久久一区二区| 亚洲国产成人片在线观看无码| 男人j进女人p免费视频| 无套内谢少妇毛片aaaa片免费| 国产免费毛卡片| 男女性杂交内射妇女bbwxz| 少妇愉情理伦片丰满丰满午夜 | 少妇与大狼拘作爱| 精品无码成人网站久久久久久| 中文字幕无码无码专区| 亚洲成人色图网| 狠狠色噜噜狠狠狠狠av| 中文字幕在线观看| 亚洲人成人一区二区三区| 插鸡网站在线播放免费观看| 欧美成人天天综合在线| 欧美老妇人与禽交| 国产成人免费视频| 国产成人无码免费视频在线 | 欧美日韩亚洲国产精品| 老色鬼永久精品网站| 中文字幕乱码中文乱码51精品| 久久九九av免费精品| 最近中文2019字幕第二页| 亚洲人成综合网站7777香蕉| 久久精品无码免费不卡| 久久久久久久无码高潮| 久热爱精品视频线路一| 女女女女bbbbbb毛片在线|